Ship construction site visits and weight tracking, on a tablet
Three applications, one workflow: prepare on a PC, record on a tablet at the yard, finish the report without retyping anything.
Role of AI :AI from the specification onwards
140 hfrom specification to the first version in production
- Sector
- Naval architecture
- Technologies
- AndroidiPadWPFWindows 11
Context
A tablet application for following the construction of ships and the evolution of their weight estimate, for a company of engineers and naval architects.
Challenge
When the engineers and naval architects visited the yards building the vessels they had designed, they took a laptop for notes and a phone for photos. It was impractical on site, it was hard to be sure everything had been recorded, and each visit was followed by a long write-up.
What we built
A three-part solution: an Android application optimised for tablets, an iPad application, and a WPF application for Windows 11. Preparation and follow-up are done on the PC, where it is faster, but can also be done on either tablet. The work during the visit itself is done on the tablet only.
Role of AI
This is our first project in which AI was used from the drafting of the specification itself. Only 140 hours of work were needed to put its first version into production.